CLUSTER “A” REHABILITATION/MAJOR REPAIR OF VARIOUS PERMNRIDGES IN BUKIDNON (Bridge)

  • Location: Bukidnon
  • Owner: DPWH – Region X
  • Cost: 11.6M
  • Period: 80 C.D.
  • Status: Completed / November 2017

LOCALLY FUNDED PROJECTS – CONSTRUCTION/REPAIR/ REHABILITATION OF
VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS ROADS AND BRIDGES LOCAL BRIDGES CONSTRUCTION OF 2 -LANE PRE-STRESSED CONCRETE GIRDER BRIDGE INCL. PIER AND SOIL EROSION MITIGATION
PROTECTION, UP LOS BAÑOS, LAGUNA (Bridge)

  • Location: Laguna
  • Owner: DPWH – Region IV-A
  • Cost: 62.3M
  • Period: 241 C.D.
  • Status: Completed / January 2017

CONSTRUCTION OF LUGUSAN BRIDGE AND APPROACHES ALONG SURIGAO DEL SUR BOUNDARY, DAVAO ORIENTAL COASTAL ROAD (Bridge)

  • Location: Davao Oriental
  • Owner: DPWH- Region XI
  • Cost: 13.7M
  • Period: 256 C.D.
  • Status: Completed / January 2013

CONSTRUCTION/WIDENING OF JACINTO BORJA BRIDGE AND WIDENING OF CAUSEWAY JCT. T.E.R. DAUIS-PANGLAO ROAD (Bridge)

  • Location: Panglao
  • Owner: DPWH- Region VII
  • Cost: 38.7M
  • Period:  1887 C.D.
  • Status: Completed / January 2012

CP-8 CONSTRUCTION OF SIX(6) BRIDGES INCLUDING ALONG KAPALONG-TALAINGOD-VALENCIA, BUKIDNON RD. (Bridge)

  • Location: Zamboanga del Norte
  • Owner: DPWH- Region XI
  • Cost: 66.4M
  • Period:  1020 C.D.
  • Status: Completed / April 2011

REPAIR OF OPOL BRIDGE APPROACHES & RECONSTRUCTION OF THE RIVER FLOOD CONTROL REVETMENT ALONG BUTUAN-CDOC-I (Bridge)

  • Location: Butuan
  • Owner: DPWH – Region X
  • Cost: 4.5M
  • Period: 181 C.D.
  • Status: Completed / September 2010

ROAD TO COMPLETE NAUTICAL HIGHWAY, REHABILITATION OF DAANG MAHARLIKA, SOUTHERN LEYTE (Bridge)

  • Location: Southern Leyte
  • Owner: DPWH- Southern Leyte District Engineering Office
  • Cost: 12.8M
  • Period: 366 C.D.
  • Status: Completed / March 2010

REPAIR/REHABILITATION OF CARAGA, QUINONOAN AND GOVERNOR LOPEZ BRIDGES ALONG DAVAO ORIENTAL-SURIGAO COASTAL RD (Bridge)

  • Location: Davao Oriental
  • Owner: DPWH- Region XI
  • Cost: 53.7M
  • Period: 394 C.D.
  • Status: Completed / January 2010

Construction of Banica Bridge Roxas City, Capiz (Bridge)

  • Location: Roxas City, Capiz
  • Owner: DPWH Region VI
  • Cost: 13.9M
  • Period: 270 C.D.
  • Status: Completed / February 2007

Construction of Mumaiag Bridge Poblacion-Dumalag-San Roque (Bridge)

  • Location: Dumalag, Capiz
  • Owner: DPWH Capiz 2nd Engg District
  • Cost: 14.9M
  • Period: 280 C.D.
  • Status: Completed / April 2006

Post-Tensioning of Girder Jaluar Bridge (Bridge)

  • Location: Ilo-ilo City
  • Owner: DPWH
  • Cost: 30M
  • Period: 200 C.D.
  • Status: Completed / August 1996

Fabrication of Pre-Street R.C. Piles-Kulipapa Bridge (Bridge)

  • Location: Ilo-ilo City
  • Owner: DPWH
  • Cost: 10M
  • Period: 150 C.D.
  • Status: Completed / July 1996

Construction of Anoling Bridge (Bridge)

  • Location: Ilo-ilo
  • Owner: RRDP
  • Cost: 11.8M
  • Period: 150 C.D.
  • Status: Completed / April 1996