Roads
CLUSTER “A” REHABILITATION/MAJOR REPAIR OF VARIOUS PERMNRIDGES (Roads)-
- Location: Bukidnon
- Owner: DPWH Region X
- Cost: 11.6M
- Period: 80 C.D.
- Status: Completed / November 2017
IMPROVEMENT/WIDENING OF FATIMA-MALABOG
ROAD INCLUDING SLOPE PROTECTION DAVAO CITY (ROADS)
- Location: Davao City
- Owner: DPWH – Davao City District Engineering Office
- Cost: 22.7M
- Period: 164 C.D.
- Status: Completed / October 2017
CONCRETING OF BRGY.LUKAY – BRGY.MALAGUINABOT – BRGY. CABATIANUHAN FMR (ROADS)
- Location: SAN MIGUEL, LEYTE
- Owner: DPWH – Leyte 1st District Engineering Office
- Cost: 4.7M
- Period: 61 C.D.
- Status: Completed / September 2017
OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE OF DAVAO CITY DIVERSION ROAD (ROADS)
- Location: Davao City
- Owner: DPWH – Davao City District Engineering Office
- Cost: 38.4M
- Period: 132 C.D.
- Status: Completed / September 2017
CONSTRUCTION: ROAD IMPROVEMENT JCT TURNO BY PASS ROAD TO LINABO PEAK (3,003 STEPS) (ROADS)
- Location: Dipolog City
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 22.3M
- Period: 148 C.D.
- Status: Completed / August 2013
REHABILITATION: ROAD IMPROVEMENT JCT. BRGY. COGON HIGHWAY TO SUNGKILAW FALLS (ROADS)
- Location: Zamboanga Del Norte
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 23.4M
- Period: 102 C.D.
- Status: Completed / June 2013
TRAFFIC ENGINEERING- PAVEMENT MARKINGS: PREVENTIVE MAINTENANCE ALONG SINDANGAN-SIAYANDUMINGAG ROAD PIAOBUYOS SECTION (ROADS)
- Location: Zamboanga Del Norte
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 649K
- Period: 33 C.D.
- Status: Completed / March 2013
REHABILITATION-ASPHALT: PREVENTIVE MAINTENANCE ALONG SINDANGAN-SIAYANDUMINGAG ROAD PIAOBUYOS SECTION (ROADS)
- Location: Zamboanga Del Norte
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 9.0M
- Period: 33 C.D.
- Status: Completed / March 2013
WIDENING OF AKLAN EAST ROAD, KALIBO, AKLAN (ROADS)
- Location: Zamboanga Del Norte
- Owner: DPWH- Aklan District Engineering Office
- Cost: 43.9M
- Period: 171 C.D.
- Status: Completed / July 2013
UPGRADING/REHABILITATION INCLUDING SLOPE PROTECTION OF CATICLAN – KALIBO (AKLAN WEST ROAD), AKLAN (ROADS)
- Location: Aklan
- Owner: DPWH- Region VI
- Cost: 90.3M
- Period: 269 C.D.
- Status: Completed / October 2013
REHABILITATION: CONSTRUCTION/IMPROVEMENT OF BORACAY CIRCUMFERENTIAL ROAD, BORACAY ISLAND, MALAY, AKLAN (ROADS)
- Location: Aklan
- Owner: DPWH- Aklan District Engineering Office
- Cost: 29.9M
- Period: 129 C.D.
- Status: Completed / May 2013
CONSTRUCTION: CONSTRUCTION/IMPROVEMENT OF BORACAY CIRCUMFERENTIAL ROAD, MALAY, AKLAN, SEC. I: STA. 000+000 – STA. 001+080; SEC (ROADS)
- Location: Boracay
- Owner: DPWH- Region VI
- Cost: 44.3M
- Period: 211 C.D.
- Status: Completed / February 2013
REPAIR OF LANGKILAAN ROAD DEPRESSION/SETTLEMENT DAANG MAHARLIKA ROAD (AGUSAN-DAVAO SECTION) (ROADS)
- Location: Agusan del Sul
- Owner: DPWH-Agusan del Sur 2nd District Engineering Office
- Cost: 9.4M
- Period: 286 C.D.
- Status: Completed / March 2013
IMPROVEMENT OF JNH BAUK-BAUK-KABANGASAN-MAPUA RD IN KAMADA-ARC BALINGOAN, MISAMIS ORIENTAL (ROADS)
- Location: Misamis Oriental
- Owner: DPWH- Misamis Oriental 1st District Engineering Office
- Cost: 35.8M
- Period: 301 C.D.
- Status: Completed / January 2013
CONSTRUCTION OF LUGUSAN BRIDGE AND APPROACHES ALONG SURIGAO DEL SUR BOUNDARY, DAVAO ORIENTAL COASTAL ROAD (ROADS)
- Location: Davao Oriental
- Owner: DPWH- Region XI
- Cost: 13.9M
- Period: 256 C.D.
- Status: Completed / January 2013
REPAIR/REHABILITATION & CONSTRACTION OF FMR, MANIKA-SITIO TAROYTOY FMR, MANIKA, LIBACAO, AKLAN (ROADS)
- Location: Aklan
- Owner: DPWH – Aklan District Engineering Office
- Cost: 13.7M
- Period: 211 C.D.
- Status: Completed / November 2012
IMPROVEMENT/CONCLUSION OF SOCORRO-NUEVA ESTRELLA-PAMOSAINGAN RD., SOCORRO, SURIGAO DEL NORTE (ROADS)
- Location: Misamis Oriental
- Owner: DPWH- Surigao del Norte 2nd District Engineering Office
- Cost: 35.8M
- Period: 301 C.D.
- Status: Completed / September 2012
REHABILITATION/RECONSTRUCTION/UPGRADNG OF DAMAGED PAVED NATIONAL ROAD GEN FR PMS/HDM-4 (INTERMITTENT SECTION) SH K1594+000-1596 (ROADS)
- Location: Boracay
- Owner: DPWH- Region X
- Cost: 22.5M
- Period: 211 C.D.
- Status: Completed / September 2012
CONSTRUCTION/IMPROVEMENT/CONCRETING OF TOMOAONG BRIDGE APPROACHES ALONG SURIGAO DEL SUR BOUNDARY DAVAO ORIENTAL COASTAL ROAD (ROADS)
- Location: SURIGAO DEL SUR
- Owner: DPWH- Region XI
- Cost: 22.7M
- Period: 113 C.D.
- Status: Completed / August 2012
REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD GEN. FROM PAVEMENT MGT. HDM4 DIPOLOG-OROQUIETA (ROADS)
- Location: Zamboanga del Norte
- Owner: DPWH- Zamboanga del Norte
- Cost: 11.3M
- Period: 35 C.D.
- Status: Completed / August 2012
REPAIR/REHABILITATION/IMPROVEMENT OF ROMAN EXPRESSWAY, LIMAY, BATAAN (ROADS)
- Location: Limay, Bataan
- Owner: DPWH – Bataan 2nd District Engineering Office
- Cost: 540K
- Period: 11 C.D.
- Status: Completed / July 2012
CONSTRUCTION/IMPROVEMENT/CONCRETING OF TOMOAONG BRIDGE APPROACHES ALONG SURIGAO DEL SUR BOUNDARY- DAVAO ORIENTAL (ROADS)
- Location: Davao Oriental
- Owner: DPWH- Region XI
- Cost: 22.7M
- Period: 113 C.D.
- Status: Completed / August 2012
REPAIR/REHABILITATION/IMPROVEMENT OF JCT. LAYAC-BALANGA – MARIVELES PORT ROAD, LIMAY, BATAAN (ROADS)
- Location: Limay, Bataan
- Owner: DPWH – Bataan 2nd District Engineering Office
- Cost: 512K
- Period: 9 C.D.
- Status: Completed / June 2012
COMPLETION(CONCRETING) OFBORACAY CIRCUMFERENTIAL ROAD, K001+600 – K002+400, BOLABOG-TULUBHAN, AKLAN (ROADS)
- Location: Aklan
- Owner: DPWH – Region VI
- Cost: 18.9M
- Period: 121 C.D.
- Status: Completed / May 2012
REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD GENERATED FROM MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT (ROADS)
- Location: Zamboanga del Norte
- Owner: Zamboanga del Norte 1st District Engineering Office
- Cost: 21.6M
- Period: 61 C.D.
- Status: Completed / April 2012
REHABILITATION/CONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD GENERATED FROM PAVEMENT MANAGEMENT SYSTEM (ROADS)
- Location: Zamboanga del Norte
- Owner: Zamboanga del Norte 1st District Engineering Office
- Cost: 8.4M
- Period: 119 C.D.
- Status: Completed / April 2012
PREVENTIVE MAINTENANCE (ASPHALT OVERLAY/INSTAPAVE SURFACE TREAMENT) (ROADS)
- Location: Zamboanga del Norte
- Owner: Zamboanga del Norte 1st District Engineering Office
- Cost: 9.5M
- Period: 51 C.D.
- Status: Completed / April 2012
PREVENTIVE MAINTENANCE (INTERMITTENTSECTION) – DIPOLOG- SINDANGAN-LILOYROAD (ROADS)
- Location: Zamboanga del Norte
- Owner: Zamboanga del Norte 1st District Engineering Office
- Cost: 16.04M
- Period: 89C.D.
- Status: Completed / March 2012
INDIVIDUAL PROJECT-CONCRETING OF SAN ROQUE-OMBAO POLPOGFMR, BULA, CAMARINES SUR (ROADS)
- Location: Camarines Sur
- Owner: DPWH- Camarines Sur 4th District Engineering Office
- Cost: 9.5M
- Period: 66 C.D.
- Status: Completed / March 2012
REHAB/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD HDM4 (ROADS)
- Location: Zamboanga del Norte
- Owner: DPWH- Zamboanga del Norte 1st District
- Cost: 17.2M
- Period: 91 C.D.
- Status: Completed / March 2012
REPAIR/REHAB/IMPR’VT.OF ROMAN EXPRESSWAY, LIMAY, BATAANKM. 135+410-KM. 137+500 W/EXCEPTION (ROADS)
- Location: Bataan
- Owner: DPWH- Bataan 2nd District Engineering Office
- Cost: 9.4M
- Period: 20 C.D.
- Status: Completed / February 2012
PREVENTIVE MAINTENANCE (INTERMITTENT SECTION) (ROADS)
- Location: Bataan
- Owner: DPWH- Zamboanga del Norte 1st District Engineering Office
- Cost: 5.3M
- Period: 61 C.D.
- Status: Completed / February 2012
REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD (ROADS)
- Location: Zamboanga del Norte
- Owner: DPWH- Zamboanga del Norte 1st District
- Cost: 6.3M
- Period: 59 C.D.
- Status: Completed / February 2012
REPAIR/REHABILITATION/IMPROVEMENT OF JCT. LAYAC-BALANGA- MARIVELES, LIMAY, BATAAN KM.140+000-KM.141+000 W/EXCEPTION (ROADS)
- Location: Bataan
- Owner: DPWH- Bataan 2nd District Engineering Office
- Cost: 9.4M
- Period: 16 C.D.
- Status: Completed / February 2012
CONSTRUCTION/WIDENING OF JACINTO BORJA BRIDGE AND WIDENING OF CAUSEWAY JCT. T.E.R. DAUIS-PANGLAO ROAD (ROADS)
- Location: Panglao
- Owner: DPWH- Region VII
- Cost: 38.6M
- Period: 1887 C.D.
- Status: Completed / January 2012
RECONSTRUCTION OF CRITICAL SECTION ALONG NATIONAL ROAD,ROAD SLIP ALONG DIPOLOG-SERGIO OSMEÑA ROAD SANGKOL (ROADS)
- Location: Zamboanga del Norte
- Owner: DPWH- Zamboanga del Norte 1st District Engineering Office
- Cost: 17.4M
- Period: 112 C.D.
- Status: Completed / December 2011
CP-4: IMPROVEMENT/CONCLUSION OF KAPALONG-TALAINGOD-
VALENCIA, BUKIDNON ROAD, BRGY. STO.NINO
SECTION, PHASE I (ROADS)
- Location: Bukidnon
- Owner: DPWH- Region XI
- Cost: 139.5M
- Period: 1153 C.D.
- Status: Completed / August 2011
CP-8 CONSTRUCTION OF SIX(6) BRIDGES INCLUDING ALONG KAPALONG-TALAINGOD-VALENCIA, BUKIDNON RD. (ROADS)
- Location: Zamboanga del Norte
- Owner: DPWH- Region XI
- Cost: 38.0M
- Period: 1020 C.D.
- Status: Completed / April 2011
REPAIR/ASPHALT OVERLAY ALONG DIPOLOG-OROQUIETA NATIONAL ROAD STA. 1844+200 TO KM. 1847+500 (ROADS)
- Location: Zamboanga del Norte
- Owner: DPWH- Zamboanga del Norte 1st District Engineering Office
- Cost: 38.0M
- Period: 126 C.D.
- Status: Completed / February 2011
UPGRADING/IMPROVMENT ALONG SINDANGAN- SIAYAN-DUMINGAGROAPIAO-SIAYANSECTION, ZAMBO.DEL NORTE (ROADS)
- Location: Zamboanga del Norte
- Owner: DPWH- Zamboanga del Norte 1st District Engineering Office
- Cost: 18.6m
- Period: 94C.D.
- Status: Completed / January 2011
REPAIR/MAINTENANCE OF NATIONAL ROADS & BRIDGES (REPAIR/MAINTENANCE OF DAMAGED PAVEMENT) (ROADS)
- Location: Zamboanga del Norte
- Owner: DPWH- Zamboanga del Norte 1st District Engineering Office
- Cost: 2.7M
- Period: 59 C.D.
- Status: Completed / December 2010
IMPRVOVEMENT/REHABILITATION (ASPHALT OVERLAY) ALONG CNHWR KM24+250 TOKM27+000 COMPOSTELA SECTION W/ EXCEPTION (ROADS)
- Location: Compostela
- Owner: DPWH- Cebu 5th District Engineering Office
- Cost: 19.6M
- Period: 35 C.D.
- Status: Completed / August 2010
UPGRADING/IMPROVEMENT OF VARIOUS FMR (TORRIJOS MARINDUQUE) (ROADS)
- Location: Marinduque
- Owner: DPWH- Marinduque District Engineering Office
- Cost: 9.6M
- Period: 101 C.D.
- Status: Completed / September 2010
UPGRADING/IMPROVEMENT OF VARIOUS FMR (BUENAVISTA, MARINDUQUE) (ROADS)
- Location: Marinduque
- Owner: DPWH – Marinduque District Engineering Office
- Cost: 7.6M
- Period: 91 C.D.
- Status: Completed / September 2010
IMPROVEMENT/REHABILITATION (ASPHALT OVERLAY) ALONG SOGOD TABUELAN ROAD KM 118+000 TO KM121+000 W/EXCEPTIONS (ROADS)
- Location: Tabuelan, Cebu
- Owner: DPWH- Cebu 5th District Engineering Office
- Cost: 19.7M
- Period: 28 C.D.
- Status: Completed / August 2010
PREVENTIVE MAINTENANCE OF DIPOLOG-SINDANGAN- LILOY ROAD (ROADS)
- Location: Tabuelan, Cebu
- Owner: DPWH- Zamboanga del Norte 1st District Engineering Office
- Cost: 4.8M
- Period: 8 C.D.
- Status: Completed / June 2010
ROAD TO COMPLETE NAUTICAL HIGHWAY, REHABILITATION OF DAANG MAHARLIKA, SOUTHERN LEYTE (ROADS)
- Location: Southern Leyte
- Owner: DPWH- Southern Leyte District Engineering Office
- Cost: 34.6M
- Period: 366 C.D.
- Status: Completed / March 2010
UPGRADING OF BARANDIAS-DOMINOROG ROAD, BACUSANON SECTION, BUKIDNON (ROADS)
- Location: BUKIDNON
- Owner: DPWH – Region X
- Cost: 27.6M
- Period: 211 C.D.
- Status: Completed / January 2010
IMPROVEMENT OF CATIGBIAN-MACAAS ROAD TUBIGON BOHOL (ROADS)
- Location: Bohol
- Owner: DPWH – Region VII
- Cost: 57.9M
- Period: 266 C.D.
- Status: Completed / December 2009
CP-5: IMPROVEMENT/CONCLUSION OF KAPALONG-TALAINGOD VALENCIA,
BUKIDNON RD. BRGY. STO NINO SECT, PHASE-2 DAVAO (ROADS)
- Location: Davao
- Owner: DPWH – Region XI
- Cost: 22.7M
- Period:550 C.D.
- Status: Completed / December 2009
REHABILITATION/RECONSTRUCTION OF CNHWR(INTERMITTENT SECT.) KM.14+505-KM.21+815, KM. 27+169-KM. 38+044, KM. (ROADS)
- Location: Cebu
- Owner: DPWH- Cebu 5th District Engineering Office
- Cost: 99.5M
- Period: 498C.D.
- Status: Completed / November 2009
TRAFFIC ENGINEERING-PAVEMENT MARKINGS: REHABILITATION/RECONSTRUCTION OF CNHWR(INTERMITTENT SECT.) KM.14+505-KM.21+815, KM. 27+169-KM. 38+044, KM. (ROADS)
- Location: Cebu
- Owner: DPWH- Cebu 5th District Engineering Office
- Cost: 6.1M
- Period: 498C.D.
- Status: Completed / November 2009
REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS
GENERATED FROM PAVEMENTMANAGEMENT (ROADS)
- Location: Aklan
- Owner: DPWH- Aklan District Engineering Office
- Cost: 31.7M
- Period: 222C.D.
- Status: Completed / October 2009
IMPROVEMENT OF JCT. (TNR) CORTES BALILIHAN- CATIGBIAN ROAD BALILIHAN CORTES SECTION (ROADS)
- Location: Catigbian
- Owner: DPWH- Region VII
- Cost: 65.5M
- Period: 211 C.D.
- Status: Completed / October 2009
CLUSTER I-A.) CONCRETING OF ROADS AT BRGY BASAK COMPOSTELA CEBU, B.) BRGY BAGAINGA, C.) BRGY COGON (ROADS)
- Location: Cebu
- Owner: DPWH- Cebu 5th District Engineering Office
- Cost: 8.0M
- Period: 71 C.D.
- Status: Completed / August 2009
Cluster – Concreting of Roads, Compostela and Carmen, Cebu (Roads)
- Location: Compostela / Carmen, Cebu
- Owner: DPWH Cebu 5th Engg District
- Cost: 10.1M
- Period: 90 C.D.
- Status: Completed / June 2009
Rehab. / Reconst. Of Damaged Paved National Road (Roads)
- Location: Altavas, Aklan
- Owner: DPWH Kalibo Engg District
- Cost: 19.2M
- Period: 270 C.D.
- Status: Completed / December 2008
Concreting of Bais-Kabankalan Road Intermittent Section (Roads)
- Location: Province of Negros Oriental
- Owner: DPWH Region VII
- Cost: 95.2M
- Period: 300 C.D.
- Status: Completed / July 2008
Concreting of Altavas Diversion Roads, Altavas, Aklan (Roads)
- Location: Altavas, Aklan
- Owner: DPWH Region VI
- Cost: 16.5M
- Period: 120 C.D.
- Status: Completed / January 2008
Maintenance / Rehab. / Improvement of Toledo-Aloguinsan Mantalongon Road Km. 81,900-84,400 (Roads )
- Location: Aloguinsan, Cebu
- Owner: DPWH Region VII
- Cost: 14.9M
- Period: 28 C.D.
- Status: Completed / September 2007
Maintenance / Rehab. / Improvement of Toledo-Aloguinsan Mantalongon Road Km. 79,400-80,900 (Roads)
- Location: Aloguinsan, Cebu
- Owner: DPWH Region VII
- Cost: 14.9M
- Period: 28 C.D.
- Status: Completed / September 2007
Repair / Rehab. Of Mactan Circumferencial Road (Pusok-Ibo-Buaya Section) Lapu-Lapu City (Roads)
- Location: Lapu – lapu City
- Owner: DPWH Region VII
- Cost: 18.2M
- Period: 40 C.D.
- Status: Completed / November 2006
Canduman Upscaling & Empowerment Project (Roads)
- Location: Canduman, Mandaue City
- Owner: Roman Aboitiz Foundation
- Cost: 11.4M
- Period: 105 C.D.
- Status: Completed / April 2005
Rehabilitation of Mandagao-Nueva Era Farm to Market Road (Roads)
- Location: Bunawan, Agusan Sur
- Owner: LGU City of Bunuwan
- Cost: 10.3M
- Period: 180 C.D.
- Status: Completed / July 2003
Concreting of Cortes-Balilihan Catigbian National Road, Province of Bohol (Roads)
- Location: Cortes, Bohol
- Owner: DPWH Regional Office
- Cost: 48M
- Period: 470 C.D.
- Status: Completed / November 2003
Improvement of Loay Interior Road, Province of Bohol (Roads)
- Location: Carmen, Bohol
- Owner: DPWH Bohol 2nd Engg District
- Cost: 22.1M
- Period: 240 C.D.
- Status: Completed / August 2003
Construction of Corella to Sikatuna Road, Province of Bohol (Roads)
- Location: Corella/Sikatuna, Bohol
- Owner: DPWH Bohol 1st Engg District
- Cost: 13.9M
- Period: 300 C.D.
- Status: Completed / November 2002
Const. of Loay Interior Road, San Miguel-Dagohoy Section (Roads)
- Location: Bohol Province
- Owner: DPWH Region VII
- Cost: 14.8M
- Period: 150 C.D.
- Status: Completed / December 2002
Concreting of JCT Nat. Road Cuartero-Maindang-Tapulang-Maayon Road, Cueartero Sectoion, Capiz (Roads)
- Location: Capiz
- Owner: DPWH Capiz Engineering District
- Cost: 18M
- Period: 300 C.D.
- Status: Completed / May 2002
Rehab. / Concreting of Dumiog Cambang-ug-Malubog Brgy. Road (Roads)
- Location: Toledo City
- Owner: DPWH Region VII
- Cost: 28M
- Period: 300 C.D.
- Status: Completed / July 2001
Asphalting / Widening of g. Ouna St., Mandaue City (Roads)
- Location: Mandaue City
- Owner: LGU City of Mandaue
- Cost: 56M
- Period: 360 C.D.
- Status: Completed / January 2000