CLUSTER 2- CONSTRUCTION/ UPGRADE/ REHABILITATION OF SLOPE PROTECTION/ SEAWALL MADRIDEJOS, CEBU: BRGY TARONG & BRGY MAALAT(FLOOD CONTROL)
- Location: Cebu
- Owner: DPWH – Cebu 1st District Engineering Office
- Cost: 26.4M
- Period: 124 C.D.
- Status: Completed / October 2017
CLUSTER 1- CONSTRUCTION/ UPGRADE/ REHABILITATION OF SLOPE PROTECTION/SEAWALL, MADRIDEJOS, CEBU: BRGY MALBAGO & BRGY MANCILANG (FLOOD CONTROL)
- Location: Cebu
- Owner: DPWH – Cebu 1st District Engineering Office
- Cost: 24.5M
- Period: 123 C.D.
- Status: Completed / October 2017
IMP/WIDENING OF FATIMA MALABOG ROAD INCLUDING SLOPE PROTECTION DAVAO CITY,K1504+223- K1504+250,K1501+(FLOOD CONTROL)
- Location: Davao City
- Owner: DPWH – Davao City District Engineering Office
- Cost: 36.1M
- Period: 164 C.D.
- Status: Completed / October 2017
CONSTRUCTION OF FLOOD CONTROL ALONG THE LEFT BANK OF DIPOLOG RIVER CONTROL, LOOC, ESTAKA, DIPOLOG (Flood Control)
- Location: Dipolog
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 62.3M
- Period: 501 C.D.
- Status: Completed / December 2013
CONSTRUCTION OF SIMUAY FLOOD CONTROL PROJECT (WIDENING OF PILOT CHANNEL) KM. 0+780 TO KM 6+100 (Flood Control)
- Location: Simuay, Sultan Kudarat
- Owner: DPWH – Region XII
- Cost: 59.7M
- Period: 272 C.D.
- Status: Completed / September 2013
CONSTRUCTION OF FLOOD CONTROL AT DISAKAN BRIDGE, JOSE DALMAN, ZAMBOANGA DEL NORTE (Flood Control)
- Location: Zamboanga del Norte
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 6.5M
- Period: 156 C.D.
- Status: Completed / June 2013
CONSTRUCTION OF DRAINAGE/PROTECTION ALONG DIPOLOG SINDANGAN- LILOY ROAD AT
SITIO CURVADA, GALAS, DIPOLOG (Flood Control)
- Location: Zamboanga del Norte
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 675K
- Period: 64 C.D.
- Status: Completed / June 2013
CONSTRUCTION OF CROSS DRAINAGE ALONG DIPOLOG-OROQUIETA ROAD, MINAOG SECTION, DIPOLOG CITY (Flood Control)
- Location: Zamboanga del Norte
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 2.3M
- Period: 61 C.D.
- Status: Completed / June 2013
CONSTRUCTION OF SEAWALL ALONG COASTAL AREA, POB.MANUKAN TO MANUKAN RIVER (PHASE2) POB. EAST MANUKAN (FLOOD CONTROL)
- Location: Zamboanga del Norte
- Owner: DPWH – Zamboanga del Norte 1st District Engineering Office
- Cost: 40.5M
- Period: 211 C.D.
- Status: Completed / August 2012
REPAIR/REHABILITATION OF SPILLWAY FOR BINUANGAN RIVER ALONG BAGAC-MARIVELES ROAD, BAGAC, BATAAN (Flood Control)
- Location: Bataan
- Owner: DPWH – Bataan 2nd District Engineering Office
- Cost: 1.8M
- Period: 39 C.D.
- Status: Completed / February 2012
CP-4: IMPROVEMENT/CONCLUSION OF KAPALONG-TALAINGOD- VALENCIA, BUKIDNON ROAD, BRGY. STO.NINO SECTION, PHASE I (Flood Control)
- Location: Bukidnon
- Owner: DPWH- Region XI
- Cost: 13.1M
- Period: 1153 C.D.
- Status: Completed / August 2011
CP-8 CONSTRUCTION OF SIX(6) BRIDGES INCLUDING ALONG KAPALONG-TALAINGOD-VALENCIA, BUKIDNON RD. (Flood Control)
- Location: Zamboanga del Norte
- Owner: DPWH- Region XI
- Cost: 15M
- Period: 1020 C.D.
- Status: Completed / April 2011
REPAIR OF OPOL BRIDGE APPROACHES & RECONSTRUCTION OF THE RIVER FLOOD CONTROL REVETMENT ALONG BUTUAN-CDOC-I (Flood Control)
- Location: Butuan
- Owner: DPWH – Region X
- Cost: 24.1M
- Period: 181 C.D.
- Status: Completed / September 2010
RESTORATION OF DAMAGED FLOOD CONTROL STRUCTURE, BRGY. 43 CAVIT, LAOAG
CITY (Flood Control)
- Location: Ilocos Norte
- Owner: DPWH – Ilocos Norte 1st District Engineering Office
- Cost: 5.19M
- Period: 52 C.D.
- Status: Completed / May 2010